List of completed or ongoing projects |
Road, safety, transport and traffic | ||
No. |
Title of the Project and its Location |
Date of Implementation |
1 |
Studying KhoramAbad- Poldokhtar Road |
7/2019 |
2 |
Studying the First and Second Stage of Coastal Road Bushehr-Shift-Genaveh (100 km) |
6/2019 |
3 |
Studing Helivand-Shah Ahmand Road |
1/2019 |
4 |
Studying the First and Second Stage of Neyzang-Tangeh Eram Road |
9/2018 |
5 |
Studying the first and second stages of type C improvements of the Lia-Ardagh-Ak route with a length of 39 km |
06/4/2019 |
6 |
Studying a section of bridges and intersections of the Bushehr second exit highway project |
7/3/2017 |
7 |
Controlling the previous (including the first and second steps) or ongoing studies on construction and asphalt pavement of the main roads by the province level consultants (fourth factor) |
20/12/2016 |
8 |
Studying the first and second stage of Bushehr highway second exit |
14/10/2015 |
9 |
Improvement studies of type (D-A) of Dalki - Kenartakhte road route Dashtestan County |
26/5/2015 |
10 |
Studying the access route to Sefidkooh Mines in Baraftab Lorestan, with an approximate length of 8 km |
18/3/2015 |
11 |
Evaluation of pavement, identification of parts and selection of suitable protective asphalt for selected roads of Gilan province |
26/2/2015 |
12 |
Studying the first and second stages of improvement of Malekshahi - Meyme route with a length of 40 km long |
16/11/2014 |
13 |
Studying the first and second stages of connecting Aran & Bidgol bypass to the Qom-Garmsar route with a length of 105 km |
12/10/2014 |
14 |
Studying the first and second stages of making the entrances to the city of Garmi 4-lane |
8/7/2014 |
15 |
Studying the first and second stages of the construction of Pirhajat – Ashgabat route |
3/7/2014 |
16 |
Studying the first and second stages of type 5 (e) improvement of the second lane of gachsaran-kheirabad route with a length of 40 km |
24/4/2014 |
17 |
Studying the first and second stages of type 5 (e) improvement of the second lane of gachsaran-kheirabad highway with a length of 25 km |
24/4/2014 |
18 |
Exploratory studies of the Pateq - Sarpol-e-Zahab route with a length 18 km and the construction of a 1600-meter twin tunnel |
6/9/2013 |
19 |
Studying the first and second stages of type 4 (type D-B) improvement of the second lane of Bisotoun-Sanqor with a length of 30 km |
28/1/2013 |
20 |
Studying the first and second stages of Qom-Salafchegan-Rahjerd highway with a length of 60 km |
23/7/2012 |
21 |
Studying the second stage of Type 5 (e) improvement of the second lane of Behmai County entrance with a length of 8 km |
19/1/2012 |
22 |
Studying the first and second stages of the road of gas wells and the detour road of Salman facilities in Lavan region with a length of 22 km |
13/8/2011 |
23 |
Identification and zoning of avalanche points and preventing the movement and fall of the avalanche in Shamshak - Dizin route with a length of 13 km |
9/3/2011 |
24 |
Exploratory studies on the construction of the second lane of Shooshtar-Gotvand route |
15/8/2010 |
25 |
Studying the first and second stages of improvements (type d-b) for making mohammadieh - abeyek route 4-lane with a length of 35 km |
17/6/2010 |
26 |
Studying the first and second stages of the construction of Noushabad - Ali Abad (Kashan) route with the length of 7 km |
8/6/2010 |
27 |
Studying the first and second stages of type (D-B) improvement to make Abbas Abad - Foulad (Aran & Bidgol) route 4-lane with a length of 8 km |
8/6/2010 |
28 |
Studying the first and second stages of the construction of the second lane of Marand bypass with a length of 8 km |
1/7/2009 |
29 |
Studying the first and second stages of the Aran & Bidgol bypass with a length of 47 km |
9/5/2009 |
30 |
Preliminary studies for the construction of second lane (type D-B improvement) of the old Amol - Babol route with a length of 30 km |
25/12/2007 |
31 |
Studying the first and second stages of immunization of high accident zones in Shahid Kasai Highway in Tabriz with a length of 16 Km |
9/9/2007 |
32 |
Studying the first and second stages of the Malekshahi - Meyme three-way with a length of 25 km long |
10/7/2007 |
33 |
Studying the development of the access road of the salt lake |
26/11/2016 |
Intersection, bridge and tunnel | ||
No. |
Title of the Project and its Location |
Date of Implementation |
1 |
Studying the first and second stages of the technical building of two river bridges and two intersections located at the Baqmalek – QalaTel route and Baqmalek bypass |
18/1/2015 |
2 |
Studying the grade separation of Bashrooyeh three-way (Shaheed Zare) |
1/3/2017 |
3 |
Studying the grade separation of Zanjan University with the old Mianeh route |
24/8/2015 |
4 |
Performing the first and second phase studies of the bridge entrance of Yas town together with geotechnical studies |
10/2/2015 |
5 |
Studying the first and second stages of the bridge and grade separation of Keshvari Square in Ilam |
7/2014 |
6 |
Studying the first and second stages of two bridges and the grade separation of Gachsaran-Kheirabad highway |
5/2014 |
7 |
Studying the first and second stages of Shams Arab River Bridge (70 meters) at Gachsaran-Kheirabad Highway |
5/2014 |
8 |
Exploratory studies on the construction of a 1600-meter twin tunnel at Pataq - Sarpol-e-Zahab route |
6/9/2013 |
9 |
Studying the first and second stages of the grade separation of Chaharzebar in Islamabad highway of Kermanshah |
10/8/2012 |
10 |
Studying the first and second stages of the grade separation of Kermanshah – Hamadan route and Sahneh highway |
21/7/2012 |
11 |
Studying the first and second stages of the grade separation of Biarjmand three-way in Shahrood - Sabzevar route |
7/4/2012 |
12 |
Studying the first and second stages of the grade separation of Hamil - Kermanshah route with the eastern bypass |
10/7/2011 |
13 |
Studying the first and second stages of the grade separation bridge of Railway with Noshabad – Kashan route |
8/11/2010 |
14 |
Studying the first and second stages of five bridges and the grade separations of Daresalaam, Railway, Abu Zayedabad, Aran & Bidgol bypass |
8/6/2010 |
15 |
Studying the first and second stages of the Oltan Bridge (river) and improving the route |
9/12/2009 |
16 |
Studying the first and second stages of repairing the Khayavachai Bridge in Meshkinshahr (8 openings with a length of 30 meters) |
14/2/2009 |
17 |
Studying the first and second stages of three bridges and grade separation of Tabriz - Orumieh freeway |
7/5/2008 |
18 |
Studying the first and second stages of reinforcing Sarbaz bridge with a length of 220 meters |
8/4/2008 |
19 |
Studying the first and second stages of immunization of grade separation of Shahid Kasai highway in Tabriz |
9/9/2007 |
Research studies and educational projects on road safety | ||
No. |
Title of the Project and its Location |
Date of Implementation |
1 |
Road Safety Audit- Tabriz- Urmieh Freeway |
6/2019 |
2 |
Road Safety Audit- Bandar Abas-Minab and Bandar Abas- Shaid Rajaee Port |
3/2019 |
3 |
Studying, designing and presenting the proposed immunization plan for Bandar Abbas - Sirjan and Persian Gulf Freeway |
21/5/2017 |
4 |
Diagnostic study and presenting a plan for improving the safety of high accident points of suburban roads of Kurdistan and Zanjan provinces |
16/5/2017 |
5 |
Safety plan for the toll checkpoint entrance at Tehran - Saveh Freeway |
13/3/2017 |
6 |
Preparing typical plans of guardrails and its components |
19/4/2016 |
7 |
Safety inspection studies on Nowruz 2015 1242 kilometers of most travelled routes of Iran including: Qom-Salafchegan-Arak-Khorramabad-Ahwaz-Khorramshahr Borazjan-Bandar Ganavah-Deylam-Hendijan-Bandar Mahshahr Safety inspection on Haram-ta-Haram Freeway |
17/1/2015 |
8 |
Safety inspection studies on most travelled routes of Khuzestan Province (1378 Km) |
31/8/2014 |
9 |
Safety Inspection studies on most travelled routes of West Azarbaijan, with a length of 700 km |
20/4/2014 |
10 |
Safety inspectioan study on most travelled roads of Mashhad |
11/12/2012 |
11 |
Safety inspection studies on Dehdez-Izeh-Baqmalek route with a length of 114 km |
28/11/2012 |
12 |
Instructions on the design of layout of signs and road safety equipment |
25/11/2007 |
13 |
Providing instructions on the application of safety bumpers and guardrails in road |
19/2/2007 |
Research studies and educational projects on road, road pavement, asphalt and bridge | ||
No. |
Title of the Project and its Location |
Date of Implementation |
1 |
Providing Current Maintenance cost estimating methods ( optimization PPP contracts) |
10/2018 |
2 |
Providing Safety Documentation For Safety Improvement of construction and Maintenance Projects |
12/2018 |
3 |
Revising Asphalt Cost Estimating Methods |
7/2018 |
4 |
Preparation instructions for implementation of the Pavement Management System |
27/9/2015 |
5 |
Preparing instructions for the implementation and maintenance of different types of airport pavement |
27/11/2010 |
6 |
Preparing instructions for design, operation and maintenance of cold asphalt |
12/1/2010 |
7 |
Instructions on designing and implementing materials for pavement layers with appropriate drainage for Iran |
30/5/2009 |
9 |
Instructions on designing, implementing and maintaining porous asphalt (field research) |
5/1/2008 |
10 |
Instructions for preventive maintenance of road pavement |
25/11/2007 |
Completed or ongoing projects on supervising road construction | ||
No. |
Title of the Project and its Location |
Date of Implementation |
1 |
Supervising the implementation of the fencing of the Mahmoud Abad powerhouse |
08/2019 |
2 |
Supervising the implementation of the Haliveh – Shah Ahmad Project |
02/2019 |
3 |
Supervising the implementation of the Songhor – Biston Project |
10/2018 |
4 |
Consulting service for client in ppp (public private partnership) contract (Mashhad – chenaran – ghochan) |
10/2018 |
5 |
Supervising the implementation of the second exit route of Bushehr (Shif-Gazboland) |
21/11/2016 |
6 |
Supervising rural roads in the counties of Ahwaz-Hamidieh |
19/12/2015 |
7 |
Supervising the executive operation of constructing the second highway lane in Gachsaran – Kheirabad route |
17/2/2015 |
8 |
Supervising executive operation of Ferdows highway with a length of 12 km |
21/4/2013 |
9 |
Supervising the construction and improvement of by-roads and rural roads in Savojbolagh County |
16/5/2017 |
10 |
Supervising roads and lanes in Region 16 of Tehran |
15/3/2016 |
11 |
Supervising construction operation of Sardar Shahid Karimi highway |
21/9/2015 |
12 |
Supervising the projects for improvement of road pavements in important routes of Iran (fourth factor) in region 3 including Tehran, Qom, Isfahan, Fars, Bushehr and Chaharmahal and Bakhtiari provinces |
18/12/2014 |
13 |
Supervising roads and lanes in Region 16 of Tehran |
22/11/2014 |
14 |
Supervising the project for Micro-surfacing asphalt pavement of Salafchegan-Saveh route |
3/7/2014 |
15 |
Supervising the project for asphalt drainage and improvement of Qom-Salafchegan-Rahjerd highway |
2/6/2014 |
16 |
Supervising the construction project of "Connecting the bypass route of Aran & Bidgol to Qom-Kashan freeway with a length of 15 km" |
19/5/2014 |
17 |
Supervising the construction project of "Connecting the bypass route of Aran & Bidgol to Qom-Garmsar route with a length of 20 km" |
19/5/2014 |
18 |
Supervising the construction and asphalt pavement project of "Kashan-Mashhad Ardehal and Kashan-Darestan routes (Amir Kabir Industrial Town) |
19/5/2014 |
19 |
Supervising the project of constructing the second lane in Kashan-Abuzeydabad route |
15/2/2014 |
20 |
Supervising the improvement and asphalt pavement of Qom-Salafchegan Highway |
3/6/2013 |
21 |
Supervising the improvement and asphalt pavement of Rudehen County roads (Jajroud-Rodehen route) |
5/8/2012 |
22 |
Supervising the construction of Malekshahi-Meyme route |
1/7/2011 |
23 |
Supervising the executive operations for improvement and widening of the south bypass of Tabriz |
4/1/2004 |
24 |
Supervising the 120 meters Khiavachai Bridge in Meshkinshahr |
29/9/2010 |
25 |
Supervising the construction project of Borazjan-Kenartakhte route |
22/5/2010 |
26 |
Supervising the project of rural roads in Kashan County |
20/8/2008 |
27 |
Supervising the project of rural roads in Isfahan County |
5/8/2008 |
28 |
Supervising the project of rural roads in Nain County |
5/8/2008 |
29 |
Supervising the construction project of Aran & Bidgol bypass with a length of 47 km |
21/5/2008 |
30 |
Supervising the executive operation immunization project of Shahid Kasai bypass in Tabriz |
6/5/2008 |
31 |
Supervising the construction project for the Second lane of Varkan-Kashan route with a length of 30 Km |
24/3/2008 |